2) Measure the voltage within the solar array within the combiner box, load switches, fuses, and breakers to see if the correct voltage is current with the load’s connections. A: one) Trace out the person department wiring backward in the concentrator and look for any noticeable injury or accidental disconnections. Clean the junction box